New Service
|
Okanogan County Electric Co-op (OCEC) OCEC is pleased to serve your electrical needs. An electrical service Installation is a joint effort between you, your building contractor, your electrical contractor, and OCEC. An engineering fee of $75 is required in order to schedule a site visit and provide a cost estimate. An OCEC Engineer will need the following information in order to assist you with providing electric service to your project: General Information
The Engineer will provide you with additional information depending on the type of service being installed and the proximity of your service to existing OCEC facilities. A usable OCEC connection point on or near your property will be necessary to provide electrical service to your project. If an OCEC connection point is not within 300 feet of your project, a primary line extension may be necessary.
|
![]() CALL 811 @ LEAST 2 DAYS BEFORE YOU DIG
|
Meter Base Location
Your meter base location must be approved by OCEC, accessible for meter reading and maintenance, and for emergency personnel to access in case of a fire.
The meter base must be located:
- Outside
- On a structure that is owned by you
- In an area not subject to being fenced in or enclosed (patio, deck, carport, backyard)
- All meters must be mounted at least 5’ (five feet), and not more than 7’ (seven feet), above final grade
Note: Meter bases should not be enclosed. However, if you choose to enclose your meter base, the enclosure must be accessible (for example, install a hinged door so that no tools are required for access to the entire panel) and meter face must be visible and unobstructed to allow meter reads and maintenance.
Customer Responsibilities
- Contact OCEC to obtain a cost estimate
- Call 811 at least 2 days before you dig
- Obtain an electrical permit, inspection and approval from the Washington State Dept. of Labor & Industries at 800/292-5920 or www.LnI.wa.gov
- Provide and install appropriate meter base, conduit, and secondary conductor; leave wire coiled at the base of the OCEC connection point
- Expose the base of the existing facility, hand digging when within 2’ of locate marks
- Return signed estimate paperwork with payment to OCEC
If applicable:
- Schedule an inspection of your Primary Trench with OCEC
- Leave conduit ends capped; provide, but do not install, sweeps at existing facility and/or proposed transformer location
- Provide 6 yards of Bedding Sand at proposed Transformer and/or junction-box (aka pedestal) location
OCEC Responsibilities
- Determine the closest existing OCEC facility
- Provide a cost estimate
- Provide and install meter
- Connect customer-provided secondary wire at OCEC connection point
If applicable:
- Provide appropriate Easement Form(s)
- Obtain City, County, State, and/or Federal Agency Right-Of-Way Permits
- Provide and install Transformer
- Provide and install Primary Wire
- Provide and install conduit for Primary riser on OCEC pole
Recommended Trench Configuration
Minimum Requirements
12” seperation from telephone to any power line
Secondary = 2’ deep
Primary = 3’ deep

| Attachment | Size |
|---|---|